Set as Homepag | Collection | OA | China Site 

Home
Project Cooperation
 Industry Application  
1Biomass power generation 
2Glass kiln waste heat power generation 
3Cement kiln low temperature waste heat power generation 
4Waste heat recovery from electric smelting furnace 
5Ore hot stove afterheat electricity generation 
6CDQ Waste Heat Power Gengeration 
7Sintering Flue Gas Waste Heat Power Generation 
8Steel Converter Waste Heat Power Generation 
9Blast-furnace Gas Power Generation Project 
10Blast Furnace Excess Pressure Power Generation 
 Project Performance  
   Project Performance   

Project Performance


As of June 2011, my company implemented a pure low temperature waste heat power generation projects, coke oven gas power generation projects and biomass power projects total installed capacity of 171MW, Projects located in every corner of China,Engineering quality rate of 90% or more.

  Company in the waste heat power generation project implementation process, gained good economic benefits and social benefits, Access to the customer and the community wide acclaim, Implementation of client, company, society and other aspects of mutual benefit and win-win situation.
 

About Us | Qualification Reputation | Technical Force | Industry Application | Project performance | Solution | Contact Us
Copyright @ 2010-2012 huaxinenergy.cn Inc. All Rights Reserved Xian Huaxin New Energy CO.,LTD  
老时时彩开奖结果 杭州理财平台招商 陕西快乐10分钟区间走势 全国期货配资网 五分彩为什么要带人赚钱 加拿大pc开奖 中国股市行业投资价 辽宁11选五历史数据 股票融资融券 最好的炒股手机 甘肃11选5遗漏走势图 七乐彩中奖规则及金额 黑龙江11选五中奖结果 江西11选5全天人工免费计划 股票入门基础知识 上海快3 浙江11选5组2组3